Services
Expert solutions for mechanical design engineering
Finite Element Analysis (FEA)
Advanced simulations for structural integrity
Detail Design
Precision engineering for optimal performance
What You Get
3D modeling of centrifugal compressor components (Rotor, Bundle, Casing, Bearing Housing, bolt connections, nozzles)
Material and fastener selection per API/ASME standards
Interface and alignment design for assembly integrity
Design-for-manufacturing (DFM) guidance
Typical Timeline
2–4 weeks (depending on component complexity and data availability)
Inputs Needed
Technical specifications or reference drawings
Performance requirements or design envelope
Preferred materials and existing standards
Add-ons
DFM/DFA optimization
Material selection and corrosion assessment
Supplier and prototype liaison
What You Get
Structural and thermal FEA of compressor components
Stress, deformation, and safety factor evaluations
Design recommendations for strength optimization
Comprehensive report with visuals and results summary
Typical Timeline
1–3 weeks (depending on model complexity and load cases)
Inputs Needed
3D CAD model with material data
Operating conditions (speed, pressure, temperature)
Load and constraint information
Add-ons
Fatigue life estimation
Thermal expansion and contact stress analysis
Design iteration and optimization study
Manufacturing Drawings
Comprehensive manufacturing documentation


Reverse Engineering
Recreated manufacturing drawings
What You Get
3D scan processing and CAD reconstruction using Geomagic
Surface and solid model creation with verified accuracy
Manufacturing drawings and dimensional reports
Deliverables: SolidWorks, STEP files, and DWG
Typical Timeline
1–2 weeks per part (depending on scan quality and geometry)
Inputs Needed
3D scan (STL/point cloud)
Reference measurements or legacy drawings (optional)
Add-ons
Digital twin creation for asset management
Obsolescence redesign and performance upgrade
Comparison reports (scan vs CAD deviation)
What You Get
Fully detailed 2D manufacturing drawings with GD&T to ASME Y14.5
Assembly drawings, exploded views, and BOM preparation
Tolerance stack-up notes and fabrication callouts
Ready-to-manufacture PDF/DWG deliverables
Typical Timeline
1–3 weeks per assembly, depending on drawing count
Inputs Needed
3D CAD model or reference geometry
Company title block or drawing template (if available)
Manufacturing or machining constraints
Add-ons
Drawing standardization and format unification
Revision control and documentation management
Translation of legacy drawings to ASME Y14.5
FAQs
What is your expertise?
We specialize in mechanical design.
What services do you offer?
We provide design, FEA, drawings, and reverse engineering.
How can I request a quote?
You can fill out our contact form for a quote.
Do you offer consultations?
Yes, we provide consultations upon request.
What is your turnaround time?
Our turnaround time varies by project.
Can you handle large projects?
Yes, we can manage projects of any size efficiently.
